Filing Room

Anatomy of an IPO. Every figure read from a filing

BEHARI LAL ENGINEERING LIMITED

IssueRs 302 cr

Amount of issue size: 3,01,62,00,000

BSE ISSUE SUMMARY, SCRIP 544870 P.1 · SHA256 7BEF2742 · ISD AMOUNT OF ISSUE SIZE

PriceRs 285

Issue Price for the current Public issue Rs. 285/- per share

BSE NOTICE 20260818-37 P.2 · SHA256 E5F13C2B · NOTICE ISSUE PRICE

Lot52 sh / Rs 14,820

Market lot: 52

BSE ISSUE SUMMARY, SCRIP 544870 P.1 · SHA256 7BEF2742 · ISD MARKET LOT

Allotted17 Aug 2026

Date of Allotment in the public issue: August 17, 2026

BSE NOTICE 20260818-37 P.2 · SHA256 E5F13C2B · NOTICE DATE OF ALLOTMENT

Listed19 Aug 2026

Date of listing: 2026-08-19

BSE ISSUE SUMMARY, SCRIP 544870 P.1 · SHA256 7BEF2742 · ISD DATE OF LISTING

Subscribed--
Last close--

01 Who was given shares, and on what terms

Anchor investors30.00%

Number of share allocated to anchor: 31,74,946

BSE ISSUE SUMMARY, SCRIP 544870 P.1 · SHA256 7BEF2742 · ISD SHARES ALLOCATED TO ANCHOR

ALLOCATED BEFORE BIDDING OPENED, AT A PRICE NOBODY BID · RS 90 CRORE

Other institutions20.00%

Number of share allocated to QIB: 21,16,632

BSE ISSUE SUMMARY, SCRIP 544870 P.1 · SHA256 7BEF2742 · ISD ALLOCATED TO QIB

QUALIFIED INSTITUTIONAL BUYERS, NET OF THE ANCHOR PORTION

Wealthy individuals35.00%

Number of share allocated to NII: 37,04,106

BSE ISSUE SUMMARY, SCRIP 544870 P.1 · SHA256 7BEF2742 · ISD ALLOCATED TO NII

NON-INSTITUTIONAL, THE PORTION ABOVE TWO LAKH RUPEES

People like you15.00%

Number of share allocated to RII: 15,87,474

BSE ISSUE SUMMARY, SCRIP 544870 P.1 · SHA256 7BEF2742 · ISD ALLOCATED TO RII

RETAIL. GUARANTEED BY LAW WHETHER OR NOT ANYONE WANTS IT

The odds of an application getting shares need the retail subscription, which comes from the bid book while bidding runs. This issue listed before this site began holding books, and the exchange withdraws the book at close, so for this issue it no longer exists anywhere.

02 The issue, and where the money went

1,05,83,158 shares offered

Number of issue shares: 1,05,83,158

BSE ISSUE SUMMARY, SCRIP 544870 P.1 · SHA256 7BEF2742 · ISD NUMBER OF ISSUE SHARES

Rs 302

crore

Amount of issue size: 3,01,62,00,000

BSE ISSUE SUMMARY, SCRIP 544870 P.1 · SHA256 7BEF2742 · ISD AMOUNT OF ISSUE SIZE

BIDDING 12 AUG 2026 TO 14 AUG 2026 PRICE FIXED AT RS 285

03 Where the money came out

100% of the money

Partly to the company, partly to selling shareholders

Rs 302 crore

COMPOSITION FRESH AND OFS · 73,20,001 SHARES SOLD BY EXISTING HOLDERS

Number of offer for sale shares: 73,20,001

BSE ISSUE SUMMARY, SCRIP 544870 P.1 · SHA256 7BEF2742 · ISD OFFER FOR SALE SHARES

to the company

THE FRESH ISSUE PORTION, AT THE ISSUE PRICE.

What the company will do with it

Rs 20 crorepurchase and installation of new equipment / machinery (including computers, printers and computer peripherals) along with civil work for such installation at Manufacturing Facility 1
Rs 3 crorepurchase and installation of new roof-top solar panels at Manufacturing Facility 1
Rs 37 crorepurchase and installation of new equipment / machinery along with civil work for such installation at Manufacturing Facility 2
Rs 3 crorepurchase and installation of new roof-top solar panels at Manufacturing Facility 2
Rs 1 croreRepayment and/ or pre-payment, in full or part, of certain borrowings availed by our Company

Net proceeds not stated, across 5 object(s): purchase and installation of new equipment / machinery (including computers, printers and computer peripherals) along with civil work for such installation at Manufacturing Facility 1 Rs 19.59 crore; purchase and installation of new roof-top solar panels at Ma

BEHARI LAL ENGINEERING LIMITED - RHP P.139 · SHA256 640351DF · OBJECTS OF THE OFFER

RS 93 CRORE RAISED BY THE COMPANY AT THE ISSUE PRICE, BEFORE THE OFFER EXPENSES THIS FILING DOES NOT YET FIX

04 What the company earns

FY 2026Rs 534.03 croreRs 64.64 crore profit for the year · 12.1% of revenue
FY 2025Rs 507.91 croreRs 52.95 crore profit for the year · 10.4% of revenue
FY 2024Rs 446.08 croreRs 35.79 crore profit for the year · 8.0% of revenue

What the filing states about the latest year · FY 2026

EBITDARs 101.33 crore
EBITDA margin18.97%
Return on net worth23.60%
Return on capital employednot stated in a table that checks out
Debt to equitynot stated in a table that checks out
Current rationot stated in a table that checks out
Net worthRs 306.10 crore

Read from the restated statement of profit and loss and the key performance indicators, which agree

9 line(s) over 2026, 2025, 2024: revenue from operations 2026 Rs 534.02 crore, 2025 Rs 507.91 crore, 2024 Rs 446.08 crore

BEHARI LAL ENGINEERING LIMITED - RHP P.86 · SHA256 640351DF · RESTATED PROFIT AND LOSS

7 indicator(s) over 2026, 2025, 2024: Revenue from operations 2026 Rs 534.02 crore, 2025 Rs 507.91 crore, 2024 Rs 446.08 crore

BEHARI LAL ENGINEERING LIMITED - RHP P.323 · SHA256 640351DF · KEY PERFORMANCE INDICATORS

05 What the revenue is

Rs croreFY 2026FY 2025FY 2024
Sale of Products-Domesticsale of goods466.08463.13401.75
Sale of Products-Deemed Exportsale of goods7.723.191.12
Sale of Products-Exportssale of goods39.3718.3819.90
Sale-Othersas the filing names it3.537.876.83
Sale of Scrapother operating revenue3.801.443.02
Sale of Consumablesother operating revenue0.070.230.03
Export Benefitsother operating revenue0.890.400.55
Job Work Incomeservices12.0112.6412.89
Job Work-Unbilled Revenueservices0.560.61--
Against the whole of it
Revenue from operations534.03507.91446.08
The share of it that is other operating revenue0.9%0.4%0.8%

9 part(s) of revenue from operations over 2026, 2025, 2024: Sale of Products-Domestic 2026 466.08 crore, 2025 463.13 crore, 2024 401.75 crore; Sale of Products-Deemed Export 2026 7.72 crore, 2025 3.19 crore, 2024 1.12 crore; Sale of Products-Exports 2026 39.37 crore, 2025 18.38 crore, 2024 19.90 crore; Sale-Others 2026 3.53 crore, 2025 7.87 crore, 2024 6.83 crore; Sale of Scrap 2026 3.80 crore, 2025 1.44 crore, 2024 3.02 crore; Sale of Consumables 2026 0.07 crore, 2025 0.23 crore, 2024 0.03 crore; Export Benefits 2026 0.89 crore, 2025 0.40 crore, 2024 0.55 crore; Job Work Income 2026 12.01 crore, 2025 12.64 crore, 2024 12.89 crore; Job Work-Unbilled Revenue 2026 0.56 crore, 2025 0.61 crore, 2024 0.00 crore

BEHARI LAL ENGINEERING LIMITED - RHP P.430 · SHA256 640351DF · REVENUE FROM OPERATIONS NOTE

Read from the note to the restated accounts, and published only where the parts add up to the revenue from operations the restated statement of profit and loss states, which is a different table in a different chapter. Other operating revenue is where a filing puts export incentives, duty drawback, government subsidies, scrap sales and insurance claims: money the company received that nobody bought anything for.

06 What the profit is made of

Rs croreFY 2026FY 2025FY 2024
Revenue from operations534.03507.91446.08
Other income12.498.393.87
Other income as a share of profit before tax14.4%12.1%7.8%
Finance cost1.491.362.31
Profit before tax86.5869.3649.92
Tax21.9516.4114.13
Effective tax rate25.3%23.7%28.3%
Profit after tax64.6452.9535.79

9 line(s) over 2026, 2025, 2024: revenue from operations 2026 Rs 534.02 crore, 2025 Rs 507.91 crore, 2024 Rs 446.08 crore

BEHARI LAL ENGINEERING LIMITED - RHP P.86 · SHA256 640351DF · RESTATED PROFIT AND LOSS

7 indicator(s) over 2026, 2025, 2024: Revenue from operations 2026 Rs 534.02 crore, 2025 Rs 507.91 crore, 2024 Rs 446.08 crore

BEHARI LAL ENGINEERING LIMITED - RHP P.323 · SHA256 640351DF · KEY PERFORMANCE INDICATORS

The tax is the difference between the two figures the statement states either side of it. Everything else is copied from the statement.

07 Where the money went

Rs croreFY 2026FY 2025FY 2024
Profit for the year64.6452.9535.79
Profit before tax, where the cash flow starts86.5869.3649.92
Cash generated from operations49.2980.8948.20
Tax actually paid(21.75)(19.00)(11.05)
Net cash from operating activities27.5461.8937.14
Net cash from investing activities(37.56)(19.67)(52.38)
Net cash from financing activities8.71(40.22)13.77
Net change in cash(1.32)1.99(1.47)
What moved between the profit and the cash
Increase/(Decrease) in trade payables and other liabilities(3.32)22.683.92
Decrease/(Increase) in trade and other receivables(22.26)(0.64)(12.88)
Decrease/(Increase) in inventories(23.29)(18.73)(2.45)

cash flow over 2026, 2025, 2024: Profit before tax 2026 86.58 crore, 2025 69.36 crore, 2024 49.92 crore; Cash generated from/(used in) operations 2026 49.29 crore, 2025 80.89 crore, 2024 48.20 crore; Income tax paid (net) 2026 -21.75 crore, 2025 -19.00 crore, 2024 -11.05 crore; Net cash flow from/(used in) operating activities 2026 27.54 crore, 2025 61.89 crore, 2024 37.14 crore; Net cash flow from/(used in) investing activities 2026 -37.56 crore, 2025 -19.68 crore, 2024 -52.38 crore; Net cash flow from/(used in) financing activities 2026 8.71 crore, 2025 -40.22 crore, 2024 13.77 crore; Net increase/(decrease) in cash and cash equivalents (A+B+C) 2026 -1.32 crore, 2025 1.99 crore, 2024 -1.47 crore

BEHARI LAL ENGINEERING LIMITED - RHP P.397 · SHA256 640351DF · RESTATED STATEMENT OF CASH FLOWS

Copied from the restated statement of cash flows, and published only where the three sections add up to the change in cash the statement states, where the operating section adds up to its own net, and where the profit it starts at is the profit the restated statement of profit and loss ends at. A figure in brackets is money leaving. Where the profit is large and the cash from operations is not, the difference is in the lines under it, and what those lines are is the whole of the answer: a lender whose cash goes out has lent it, a builder whose cash goes out has bought land, and this page does not decide which of those a reader is looking at.

08 How old the money owed is

Schedule III makes every company print its trade receivables in buckets measured from the due date. It is published here only where the buckets add up and where the total agrees with the movement the statement of cash flows states. This prospectus states the schedule in a shape this reader does not yet follow, or states one that does not reconcile.

09 What moved between the company and its owners

Rs croreFY 2026FY 2025FY 2024
Every transaction with a related party3.6620.95102.84
Neither side stated by the filing3.6620.95102.84
As a share of revenue from operations0.7%4.1%23.1%
Counterparties the filing describes in other words
3.6620.95102.84
Enterprises over which KMP is able to exercise significant influence or control BLC Metals Private Limited----48.07
Neither side stated by the filing----48.07
Loan Received Back----24.03
Neither side stated by the filing----24.03
Amount Paid against Preference Share Redemption--10.40--
Neither side stated by the filing--10.40--
Sale of Investment--3.65--
Neither side stated by the filing--3.65--
Salary Paid0.730.700.84
Neither side stated by the filing0.730.700.84
Managerial remuneration0.540.380.97
Neither side stated by the filing0.540.380.97
Interest Received----0.50
Neither side stated by the filing----0.50
BLC Metals Private Limited----0.50
Neither side stated by the filing----0.50
Enterprises over which KMP is able to exercise significant influence or control Dinesh Garg HUF--0.420.05
Neither side stated by the filing--0.420.05
Rent paid0.340.440.58
Neither side stated by the filing0.340.440.58

49 transaction(s) with related parties over 2026, 2025, 2024, read from pages 91, 92, 93: 2026 Rs 3.66 crore, 2025 Rs 20.95 crore, 2024 Rs 102.84 crore

BEHARI LAL ENGINEERING LIMITED - RHP P.91 · SHA256 640351DF · RELATED PARTY TRANSACTIONS

49 transaction(s) stated, rolled up by counterparty. Each amount is stated beside a percentage, and every percentage in a year is taken on revenue from operations. The filing names more counterparties than are listed here. The total above is every one of them. The grouping follows the relationship the filing states for each counterparty, which is printed under every name. The direction follows the filing’s own name for the transaction; where that does not say which way the money went, the amount is carried as neither.

10 What the shares already in issue were paid for

Every prospectus states what was paid for the shares already in issue, allotment by allotment, since the company was incorporated. It is published here only where the allotments add up to the capital the exchange separately states was in issue before the offer. On this prospectus they do not, so the table is not shown.

11 When those shares come back to the market

17 AUG 2026 ALLOTMENT19 AUG 2026 LISTEDRs 45 crore15,87,473 SHARES UNLOCK16 SEP 2026 Anchor lock-in, first trancheRs 45 crore15,87,473 SHARES UNLOCK15 NOV 2026 Anchor lock-in, second tranche
  1. 17 Aug 2026ALLOTMENT
  2. 19 Aug 2026LISTED
  3. 16 Sep 2026Anchor lock-in, first trancheRs 45 crore · 15,87,473 SHARES UNLOCK
  4. 15 Nov 2026Anchor lock-in, second trancheRs 45 crore · 15,87,473 SHARES UNLOCK

12 Every dated unlock, with the page it was read from

Anchor lock-in, first tranche

16 Sep 2026

ICDR Sch XIII Pt A Cl.10(j) · 30 days

Shares: 15,87,473

At the issue price: Rs 45.24 crore

Source: BSE issue summary, scrip 544870 p.1 7bef2742

Number of share allocated to anchor: 31,74,946

BSE ISSUE SUMMARY, SCRIP 544870 P.1 · SHA256 7BEF2742 · ISD SHARES ALLOCATED TO ANCHOR

Period: 30 days

locked-in for a period of 30 days from the date of Allotment

BEHARI LAL ENGINEERING LIMITED - RHP P.548 · SHA256 640351DF · STATED ANCHOR FIRST TRANCHE

Anchor lock-in, second tranche

16 Nov 2026

ICDR Sch XIII Pt A Cl.10(j) · 90 days

Shares: 15,87,473

At the issue price: Rs 45.24 crore

Source: BSE issue summary, scrip 544870 p.1 7bef2742

Number of share allocated to anchor: 31,74,946

BSE ISSUE SUMMARY, SCRIP 544870 P.1 · SHA256 7BEF2742 · ISD SHARES ALLOCATED TO ANCHOR

Period: 90 days

90 days from the date of Allotment

BEHARI LAL ENGINEERING LIMITED - RHP P.548 · SHA256 640351DF · STATED ANCHOR SECOND TRANCHE

Not dated on this page, and why

30.00% of this issue was allocated before the public could bid, at a price nobody bid.

BSE ISSUE SUMMARY, SCRIP 544870 P.1 · SHA256 7BEF2742 · NOTHING HERE IS ADVICE.

Free forever. No advertising, no affiliate links, no paid tier. No grey market premium. No scores, no ratings. Nothing here is investment advice.